Static Solar & Electrical
SHARED DOCUMENT REGISTER
Updated 26 September 2026

FOR LEWIS & JULES

The Document Vault

One place to find the plans, guides and reference pages we have published for Static.

Bookmark this page. Public documents and protected team guides are listed separately below, with a short description and the permanent link for each.

Showing all 10 documents

01 · PUBLIC LINKS

Public documents

These pages open without a team login. Share their permanent links when you want someone to read the document.

Sales & operationsPublic link

Deposit before signature: CRM diagnosis and proposed fix

Why an early deposit can leave a job in Sales, and a proposed awaiting-signature stage in Operations. Includes diagrams, inspected CRM rules and a test plan.

Diagnostic report from Jules to Lewis and Andrew. No CRM changes applied; business policy and implementation remain to be agreed.

https://static-deposit-before-signature.pages.dev/
02 · NON-PUBLIC LINKS

Protected team guides

These links open the existing Static Team Access gate. They are hosted online, but their contents require team access.

Bookings & trainingTeam access required

Appointment setter: calendar-first booking guide

The team guide for booking a real appointment at the door, checking customer details, recording useful context and handling changes to an existing booking.

The Static Team Access gate is active. Use the existing team access arrangements. Guide contents were not rechecked behind the gate during this inventory.

https://setter-hub.pages.dev/

Keeping the record together

This register covers the published documents found across eight Static document-hosting projects, including the two guides within Setter Hub and both invoicing guides. The invoicing screenshot download is included with Lewis’s setup guide.

Local HTML files, drafts and archive copies are excluded from this shared Vault. The Vault links to published pages; private working files remain outside the register.

The deposit report link was checked on 26 September 2026; the earlier links were last checked on 18 September 2026. A working link confirms availability, not that every instruction or proposal remains current. The two protected guides were checked to their access gate.